Siemens S7-300 to S7-1500 migration
Off S7-300. Into S7-1500 and TIA Portal, on your outage schedule.
Scoped at the machine, staged around your outage windows, and brought live on the floor by an on-site team from Anderson, SC.
- From
- S7-300, S7-400
- To
- S7-1500 in TIA Portal
- Cutover
- Staged to your outages
Illustrative model
- Today: S7-300The old controller runs the ET 200M I/O
- Cut overThe old controller stops in the outage
- Controller firstExisting I/O and field wiring stay put
- S7-1500 on the I/OCycle, safety and operator acceptance
Platform status
Spares only
Siemens S7-300 and ET 200M have been spare parts only since October 1, 2025.
Source: Siemens, Oct 1, 2025
- Active productUntil Oct 1, 2023
- Spare parts onlySince Oct 1, 2025
- Spare parts plannedUntil Oct 1, 2033
Why plan the migration now
The failure picks the date if you don't.
A failed CPU or I/O card with no spare turns a planned project into an emergency in the middle of a shift.
The software is aging too.
Many STEP 7 V5.x / SIMATIC Manager projects live on a single old laptop. TIA Portal puts the controller, HMI, and drives in one current project your team can maintain.
Planned work costs less.
A staged migration fits the outages you already have. An unplanned one creates its own outage.
What changes from S7-300 to S7-1500
The right path for your line comes out of the audit: I/O count, networks, safety, HMIs, and how much outage time you can give it.
| Today | After migration |
|---|---|
| TodayS7-300 / S7-400 CPU | After migrationS7-1500 (or S7-1200 on small machines) |
| TodayET 200M distributed I/OSpares only | After migrationET 200SP / ET 200MP, or keep the existing I/O where a staged plan allows |
| TodaySTEP 7 V5.x / SIMATIC Manager | After migrationTIA Portal |
| TodayMPI and PROFIBUS DP | After migrationPROFINET, with PROFIBUS kept where it makes sense |
| TodayOP / TP panels, WinCC flexible | After migrationComfort Panels and WinCC in TIA Portal |
| TodayF-CPU safety (where present) | After migrationS7-1500F safety in TIA Portal, revalidated |
How we migrate
Audit at the machine
We collect the STEP 7 project (and confirm it matches what's running), the hardware configuration, the network layout, and everything connected to the controller: panels, drives, and other PLCs on MPI or PROFIBUS. We photograph the racks and note what's undocumented.
Convert, then clean up
TIA Portal can migrate a STEP 7 project, but going from S7-300/400 to S7-1500 changes addressing, data handling, and some instructions. We review and rework the converted code and document it as it moves, so the next person can read it.
Stage the hardware
TIA Portal supports S7-300 and S7-400, so one option is to move the project into TIA Portal on the existing CPU first and swap to S7-1500 in a later outage. Another is to keep the distributed I/O and field wiring while the controller changes. We lay out each option and the outage it needs.
Test before cutover
Logic, I/O mapping, and HMI tags are checked before the outage, with a way back to the old controller if the line needs it.
Cut over and prove it
We're on-site through the outage and startup: cycle, safety, and operator acceptance before we leave, then documentation and a clean handoff to your maintenance team.

Staged or all at once
| Pattern | How it runs |
|---|---|
| Software first | Move to TIA Portal on the existing hardware now, and swap the CPU in the next shutdown. |
| Controller first, I/O later | A new S7-1500 talks to the existing distributed I/O. Field wiring stays put. |
| Line by line | Migrate one cell or line per outage, keeping the rest running on the old platform. |
| Whole cell in one outage | Fastest overall if you have a long enough shutdown and good preparation. |
Modeled best case
A best-case model, not a measured result.
Modeled line: an S7-315 assembly line with ET 200M I/O, moved into TIA Portal first, then to S7-1500 in a second planned outage.
Minutes to find a failed module, per fault
Before: 40 minAfter: 5 min
S7-1500 system diagnostics name the station, module and fault in plain text on the CPU display and the HMI.
Hours down per failed CPU
Before: 36 hAfter: 1 h
With a current S7-1500 spare on the shelf and the program on its memory card, a failed CPU is a swap.
CPU cycle time, per scan
Before: 24 msAfter: 6 ms
The reworked program runs in optimized blocks on a faster S7-1500 CPU, so the same logic scans in less time.
Illustrative figures for the line, cell or area described, when everything goes right. They are not measured, not from any plant we have supported, not typical, and not a promise. A real job starts from your own baseline.
Plants we’ve supported
All plants supportedBMW Plant 10Automotive, Greer, SC
Mercedes-Benz U.S. InternationalAutomotive, Vance, AL
TeslaElectric vehicle production
Robert Bosch LLCAutomotive, Charleston, SC
- Our next value-added customerYour plant
Straight answers.
Is the S7-300 really end of life?
Siemens announced the phase-out of the S7-300 and ET 200M on October 1, 2023, and they became spare parts only on October 1, 2025. Spares remain available for a period, but supply shrinks over time, so planning the migration now avoids an emergency later.
Can we migrate in a single weekend outage?
Sometimes. It depends on the I/O count, networks, HMIs, safety, and how much preparation and testing is done before the outage. Many plants stage the work, moving the software first and the hardware later, to fit shorter outages.
Do we have to replace the I/O and rewire?
Not always. Depending on the system, a new S7-1500 can run existing distributed I/O while the controller changes, and field wiring can stay in place. We lay out the options at the machine.
Can a STEP 7 project be converted to TIA Portal?
Yes. TIA Portal can migrate STEP 7 projects, and we review and rework the result because the move to S7-1500 changes addressing and some instructions.
What happens to our HMI panels?
Older OP and TP panels and WinCC flexible projects usually move to Comfort Panels and WinCC in TIA Portal. We include the HMI in the migration plan so tags and screens match the new controller.
Does TS Controls carry TIA Portal licenses?
Yes. We carry licensing for current TIA Portal versions.
Are S7-300 migrations done outside South Carolina?
Yes. We are based in Anderson, SC, and do on-site migrations across the Southeast and nationwide.
Get a migration plan before the spare runs out.
What to send
- STEP 5: the whole project folder, zipped (the program file ends in ST.S5D, plus the other S5D files beside it).
- STEP 7 V5.x: a SIMATIC Manager archive (.zip), from File > Archive.
- TIA Portal: a project archive (.zapNN) from Project > Archive, and the TIA Portal version and update level.
- RSLogix 5 and 500: the program file (.RSP or .RSS), saved from the software or uploaded from the PLC first.
- Studio 5000: the project (.ACD) or an .L5X export, and the controller firmware revision.
- Robot backups: a full KUKA archive, a FANUC “All of above” backup or an ABB controller backup.