
Siemens PLC and HMI
From legacy Step 5 to current TIA Portal. We write, debug, and migrate SIMATIC programs so your line does not wait on a retired platform.
Siemens PLC programming — detailsSiemens, Allen-Bradley, KUKA, FANUC, and ABB. Legacy hardware included. Nationwide.
Platforms

From legacy Step 5 to current TIA Portal. We write, debug, and migrate SIMATIC programs so your line does not wait on a retired platform.
Siemens PLC programming — details
Studio 5000, RSLogix, FactoryTalk View, PowerFlex, and Kinetix. We still speak PLC-5 and SLC 500.
Allen-Bradley PLC programming — details
Offline programming, multi-robot cells, and end-of-arm tooling. WorkVisual, RoboGuide, RobotStudio, KRL, and RAPID.
Robot programming services — detailsAlso in scope
Drives, networks, I/O, HMI, and tooling — the work that decides whether the cell makes rate.
PowerFlex and Kinetix on Allen-Bradley systems, SINAMICS on Siemens systems, SEW and third-party drives
EtherNet/IP, PROFINET, PROFIBUS, DeviceNet, TCP/IP. Network reference
I/O design, panel checkout, and device commissioning
Programming, I/O, drives, and robots brought up together on-site, then debug, cycle time, safety, operator acceptance, and production coverage
Old and new platforms in one cell
PLC and robot program backup, version control and change tracking with versiondog and octoplant
FactoryTalk View on Allen-Bradley; WinCC and Comfort Panels in TIA Portal on Siemens; Ignition programming, Ignition certified
Plant-floor data, OEE and downtime, and production reporting, with links to business systems where needed
Design, build, and modification, with robot programming
Call (877) 790-4697, any hour, subject to personnel availability. How line-down support works
Adaptive machine-based learning, hands-free optimization
Robot programming for automotive and EV plants: body shop, press shop, hemming, spot weld
Based in Anderson, SC: PLC programming in Greenville, SC and the Upstate, and on-site nationwide
Method
We start with the plant, not a template. Goals, constraints, existing code, and the outcome you actually need.
Hardware, networks, HMI, and software architecture on one blueprint.
Programming, I/O, drives, and robotics brought up together — on-site.
Debug, cycle-time, safety, and operator acceptance before we leave.
Commissioning, documentation, and a clean handoff.
Straight answers
Siemens, from Step 5 and Step 7 through TIA Portal, S7-1200, and S7-1500; Allen-Bradley, from PLC-5 and SLC 500 through ControlLogix and CompactLogix in Studio 5000; and KUKA, FANUC, and ABB robots. See Siemens PLC programming, Allen-Bradley PLC programming, and robot programming.
Yes: PLC-5 to ControlLogix, SLC 500 to CompactLogix, S7-300 and S7-400 to S7-1500, and Step 5 to S7-1500 in TIA Portal, planned while the old hardware still runs and cut over in your outage window.
Yes. PowerFlex and Kinetix on Allen-Bradley systems, SINAMICS on Siemens systems, and SEW and other third-party drives: install, setup, and optimization on the floor.
Yes. EtherNet/IP, PROFINET, PROFIBUS, DeviceNet, and TCP/IP, with I/O checkout on the floor. The industrial networks reference lists device files, ports, and the official specifications.
Yes. FactoryTalk View ME and SE on Allen-Bradley, and WinCC and Comfort Panels in TIA Portal on Siemens. In a migration, PanelView Standard terminals, OP and TP panels, and WinCC flexible projects move to current software.
Yes. TS Controls is Ignition certified. See Ignition programming and SCADA/MES integration.
Yes. PLC and robot program backup, version control and change tracking with versiondog and octoplant.
Yes. Programming, I/O, drives, and robotics brought up together on-site, then debug, cycle time, safety, and operator acceptance before we leave, with documentation and a clean handoff.
Call (877) 790-4697, 24/7, subject to personnel availability. For planned work, send the RFQ or call the office at (877) 524-6674.
We Make Solutions Happen
Send the platform, the symptom, and the outage window. We will come back with a plan — not a brochure.