Line down now
Call, don’t email, when production is stopped. Siemens, Allen-Bradley, KUKA, FANUC, and ABB, including legacy hardware.
24/7, subject to personnel availability.
Illustrative model
Call, don’t email, when production is stopped. Siemens, Allen-Bradley, KUKA, FANUC, and ABB, including legacy hardware.
24/7, subject to personnel availability.
Siemens S7-300 and ET 200M have been spare parts only since October 1, 2025. We still speak PLC-5 and SLC 500.
PLC, HMI, drive, network, and industrial robot programming and commissioning for Siemens, Allen-Bradley, Beckhoff, KUKA, FANUC, and ABB, legacy platforms included, plus on-site production support.
Programmed, commissioned, and supported on your floor.
Three plans for critical lines: priority remote help, priority on-site help with scheduled checkups, or a dedicated engineer.
Help on every plan is subject to personnel availability.
Networks: EtherNet/IP, PROFINET, PROFIBUS, DeviceNet, TCP/IP, and EtherCAT on Beckhoff systems. Network reference
Siemens, from Step 5 and Step 7 through TIA Portal, S7-1200, and S7-1500; Allen-Bradley, from PLC-5 and SLC 500 through ControlLogix and CompactLogix in Studio 5000; Beckhoff, TwinCAT 3 with EtherCAT I/O and motion; and KUKA, FANUC, and ABB robots. See Siemens PLC programming, Allen-Bradley PLC programming, Beckhoff programming, and robot programming.
Yes: PLC-5 to ControlLogix, SLC 500 to CompactLogix, S7-300 and S7-400 to S7-1500, and Step 5 to S7-1500 in TIA Portal, planned while the old hardware still runs and cut over in your outage window.
Yes. PowerFlex and Kinetix on Allen-Bradley systems, SINAMICS on Siemens systems, and SEW and other third-party drives: install, setup, and optimization on the floor.
Yes. EtherNet/IP, PROFINET, PROFIBUS, DeviceNet, EtherCAT, and TCP/IP, with I/O checkout on the floor. The industrial networks reference lists device files, ports, and the official specifications.
Yes. FactoryTalk View ME and SE on Allen-Bradley, WinCC and Comfort Panels in TIA Portal on Siemens, and TwinCAT HMI on Beckhoff. In a migration, PanelView Standard terminals, OP and TP panels, and WinCC flexible projects move to current software.
Yes. TS Controls is Ignition certified. See Ignition programming and SCADA/MES integration.
Yes. PLC and robot program backup, version control and change tracking with versiondog and octoplant.
Yes. Programming, I/O, drives, and robotics brought up together on-site, then debug, cycle time, safety, and operator acceptance before we leave, with documentation and a clean handoff.
Yes. Production support keeps an engineer on your floor after startup: debug at the machine, cycle-time work, coverage on the agreed shifts through launch, and a clean handoff to your team.
Call (877) 790-4697, 24/7, subject to personnel availability. For planned work, request a quote or call the office at (877) 524-6674.
Quotes are sized to the job. Emergency and after-hours work is billed under our Engineering Services Rate Schedule: overtime and Sunday and holiday multipliers, an on-site minimum per visit, and travel counted portal to portal. The hourly rates go out by email: ask us for a copy.
We will come back with a plan — not a brochure.
Requests sent by 3 PM Eastern get a reply the same business day.