P/TS Client is on Kickstarter until Dec 20, 2026: S7-300 troubleshooting and block editing for SIMATIC Manager.P/TS Client is on Kickstarter until Dec 20 See the campaign

TS Controls home

On-site PLC, HMI & robot programming in Upstate South Carolina and nationwide.

Siemens, Allen-Bradley, Beckhoff and Ignition. KUKA, FANUC and ABB robots. Programmed, commissioned and supported on your floor, not from a cubicle two states away.

Request a quote
Line down? (877) 790-4697 24/7, subject to personnel availability
Founded
July 2023
Based in
Anderson, SC
Coverage
On-site nationwide

What do you need?

Line down now

Call, don’t email, when production is stopped. Siemens, Allen-Bradley, KUKA, FANUC, and ABB, including legacy hardware.

(877) 790-4697

24/7, subject to personnel availability.

Migrate a legacy PLC

Siemens S7-300 and ET 200M have been spare parts only since October 1, 2025. We still speak PLC-5 and SLC 500.

Program or commission a cell or line

PLC, HMI, drive, network, and industrial robot programming and commissioning for Siemens, Allen-Bradley, Beckhoff, KUKA, FANUC, and ABB, legacy platforms included, plus on-site production support.

Programmed, commissioned, and supported on your floor.

Set up a support plan

Three plans for critical lines: priority remote help, priority on-site help with scheduled checkups, or a dedicated engineer.

Help on every plan is subject to personnel availability.

Weld schedule, one spot

Illustrative

Illustration: a spot-weld schedule of about 600 milliseconds. Electrode force builds to 3.2 kilonewtons during squeeze, weld current runs at 9.6 kiloamps during weld, and force holds while the nugget cools.

  1. Squeeze0–200 ms
  2. Weld200–400 ms
  3. Hold400–540 ms
  4. Release540–600 ms
Force
3.20kN
Current
9.6kA
Time
300ms
The values are illustrative, not from a customer's weld controller.

Plants we’ve supported

On the floor at plants that cannot miss cycle time.

All plants supported
  • BMW Plant 10Automotive, Greer, SC
  • TeslaElectric vehicle production
  • SpaceXAerospace
  • Mercedes-Benz U.S. InternationalAutomotive, Vance, AL
  • Magna DriveAutomotive manufacturing
  • SpaceXAIArtificial intelligence, Industrial systems
  • VolvoAutomotive production
  • Robert Bosch LLCAutomotive, Charleston, SC
  • thyssenkrupp TKAE / TKABAutomation engineering, Body solutions
  • ZF TransmissionsAutomotive transmissions
  • Fives DyAGAutomation integration, Controls engineering
  • Our next value-added customerYour plant

We still speak PLC-5 and SLC 500.

Platforms we program

All services

Siemens

Step 5 through TIA Portal.

Controllers
S5 to S7-1500
Software
STEP 5, STEP 7, TIA Portal
Networks
PROFINET, PROFIBUS, MPI
Siemens PLC programming

Allen-Bradley

PLC-5 through ControlLogix.

Controllers
PLC-5 to ControlLogix
Software
RSLogix 5, 500, Studio 5000
Networks
DH+, DeviceNet, EtherNet/IP
Allen-Bradley PLC programming

Robotics

KUKA, FANUC, ABB.

Robots
KUKA, FANUC, ABB
Languages
KRL, TP and KAREL, RAPID
Offline
WorkVisual, ROBOGUIDE, RobotStudio
Robot programming

Ignition

Perspective and Vision, Ignition certified.

Certification
Ignition certified
PLCs
Siemens, Allen-Bradley
Coverage
On-site nationwide
Ignition programming

SCADA/MES

Counts, downtime, and OEE.

Data
Counts, downtime, OEE
Sources
Siemens, Allen-Bradley PLCs
SCADA
Ignition or the one you run
SCADA/MES integration

Industry 5.0

KUKA was the prototype — integrated with Siemens TIA Portal, running hands-free optimization on the iron before we talked about rolling it out. That cell proved the method. The method is what we are expanding.

Industry 5.0 adaptive learning and the Industry 5.0 pilot.

Straight answers.

What is Industry 5.0 at TS Controls?

AI adaptive machine-based learning that optimizes the cell hands-free — no more weld touchups, no more robot touchups. KUKA with Siemens TIA Portal was the prototype. We are expanding to Allen-Bradley, FANUC, ABB, and platforms still to be named.

What control platforms do you support?

Siemens (Step 5, Step 7, SIMATIC, TIA Portal, WinCC, SINAMICS, PROFINET), Allen-Bradley (ControlLogix, CompactLogix, PLC-5, SLC 500, PowerFlex, Kinetix, Studio 5000, FactoryTalk View), Beckhoff (TwinCAT 3, EtherCAT), KUKA, FANUC, and ABB robots, and Ignition (we’re Ignition certified). We also handle PLC and robot program backup, version control and change tracking with versiondog and octoplant.

Where are you based, and do you travel to the plant?

We are based in Anderson, South Carolina, and yes, we come to you: on-site across the Upstate and nationwide. Evaluations happen at the machine so the first trip is not a guessing trip.

How do quotes work?

Quotes are sized to the job, not to a day rate. Send the platform, the symptom, and the outage window to sales@ts-controls.com.

Are PLC-5, SLC 500 and Step 5 still supported?

Yes. We still speak PLC-5 and SLC 500, and we work from legacy Step 5 through current TIA Portal — including migrations off retired platforms: PLC-5 to ControlLogix, SLC 500 to CompactLogix, S7-300 to S7-1500, and Step 5 to TIA Portal.

What are your hours, and is there emergency line-down support?

Monday–Friday, 9:00am–5:00pm Eastern, by appointment. Field work follows the outage window the plant needs. Line down? Call (877) 790-4697, 24/7, subject to personnel availability. What happens when you call. Production support puts an engineer on your floor for agreed shifts, through launch.

Can adaptive learning eliminate weld and robot touchups?

That is the goal of our Industry 5.0 work: adaptive learning keeps paths, offsets, and weave inside spec without a weekend on the teach pendant. Tell us about your cell.

Tell us what the line is doing.

We will come back with a plan — not a brochure.

Request a quote
Line down? (877) 790-4697 24/7, subject to personnel availability

Requests sent by 3 PM Eastern get a reply the same business day.

How we work

“A handshake still means something.”

Integrity first. Then the work. We do not lie or exaggerate to win a PO.

No plant too small or too far

We come to you. Quotes sized to the job, not to a day-rate theater.

On-site before we write code

Evaluations happen at the machine so the first trip is not a guessing trip.

We do not inflate scope

We work to beat competing quotes without cheapening the result. Safety is not a line item we shave.