Planning work? Office (877) 524-6674, Monday–Friday, 9:00am–5:00pm ETOffice (877) 524-6674

TS Controls home

Robot programming for automotive and EV plants: KUKA, FANUC, ABB

Body shop, press shop, hemming, spot weld: programmed on your floor.

KUKA, FANUC, and ABB robot programming, offline simulation, and commissioning for automotive and EV plants, from an on-site team based in Anderson, SC.

Request a quote
Line down? (877) 790-4697 24/7, subject to personnel availability

Illustrative model

  1. Panel loadedMaterial handling onto the hemming anvil
  2. HandshakesBetween the robots and the PLC
  3. Roller hemmingPath programming for closures
  4. Part outThe hemmed closure to the out rack

Automotive and EV lines don't leave much slack. Cycle time is fixed, outages are short, and a robot that drifts out of position shows up as rework downstream. TS Controls programs, commissions, and supports KUKA, FANUC, and ABB robots in automotive and EV plants, along with the Siemens or Allen-Bradley PLC that runs the cell. We're based in Anderson, South Carolina, in the middle of the Southeast auto corridor, and we work on-site nationwide.

Spot weld

Spot weld, sealer, and material handling in multi-robot body cells.

Multi-robot cells. Interference zones, handshakes, and cycle balancing between robots and the PLC.

Body-in-white

EV production lines. Robot programming and cell support for high-rate EV body and assembly work.

Model-year and new-part changeovers. New paths and positions added without breaking what already runs.

Roller hemming

Hemming and roller hemming cells. Path programming and touchup for closures.

Press shop

Press tending and part transfer.

Vision-guided work. Flexible picks and guided paths where fixtures can't hold every part the same way.

KUKA, FANUC, and ABB

Brand Tools and languages we work in
KUKA WorkVisual, KRL
FANUC ROBOGUIDE (offline programming and simulation), teach pendant programming
ABB RobotStudio, RAPID

Many plants run more than one brand, sometimes in the same building. We work across all three, so you don't need a separate contractor for each.

Offline programming before the outage

Outage time is the scarcest resource on an auto line. Where the cell data allows, we map the cell, the robots, and the fixtures graphically and simulate the program offline before anyone climbs the cage. That moves path development, reach checks, and interference checks out of the outage and into the week before. On-site time then goes to touchup, I/O checkout, and proving the cycle.

What helps us program offline:

  • Cell layouts and fixture models (CAD), if available
  • Robot models, controller generation, and software options
  • Current robot backups
  • The sequence and the PLC handshake signals
  • Cycle-time targets

One team for the robot and the PLC

A lot of cell problems live at the boundary: the robot is waiting on the PLC, the PLC is waiting on the robot, and each vendor points at the other. We program both sides: KUKA, FANUC, and ABB robots, and Siemens (TIA Portal, S7-1500) or Allen-Bradley (ControlLogix, Studio 5000) cell logic, plus the safety and network layers in between (PROFINET, EtherNet/IP). One team owns the handshake.

End-of-arm tooling

We design and build end-of-arm tooling in-house or modify what you have: weld guns, spray, grinders, grippers, vacuum, and magnets. Tooling and robot program are developed together, so the TCP, payload data, and paths match the hardware that's actually on the robot.

Fewer weld and robot touchups: Industry 5.0

Weld cells drift, and touchups eat maintenance time. Our Industry 5.0 work uses adaptive machine-based learning to keep weld cells in spec without manual touchups. The prototype is live on KUKA with Siemens TIA Portal, and Allen-Bradley, FANUC, and ABB are in expansion. If you run KUKA weld cells on Siemens controls and want to discuss a pilot, ask us. See Industry 5.0 adaptive robot learning.

How a robot job works

  1. Describe the cell. Robots, fixtures, the motion or change you need, and the outage window. Attach layouts, drawings, and backups.
  2. Evaluation. We review the data and, where needed, see the cell on-site first.
  3. Offline work. Programs developed and simulated before the outage where possible.
  4. On-site. Touchup, I/O checkout, cycle proving, and safety verification with your team.
  5. Handover. Updated backups, notes, and a cell your maintenance team can support.

Where we work

From Anderson, SC we support automotive, EV, and aerospace plants across the Upstate, the Carolinas, Georgia, Alabama, and Tennessee, and we travel nationwide. Plants we've supported include BMW Plant 10, Mercedes-Benz U.S. International, Tesla, and Volvo.

Robot down on the line? Call (877) 790-4697, 24/7, subject to personnel availability.

Robot brands, offline programming and multi-robot weld cells are answered on robot programming, weld touchup time on Industry 5.0.

Plants we’ve supported

All plants supported

Frequently asked questions

Is end-of-arm tooling designed and built too?

Yes. Weld guns, spray, grinders, grippers, vacuum, and magnets. We build EOAT in-house or modify what you have.

Are model-year changeovers and new parts supported?

Yes. We add new paths and positions, update the PLC sequence, and prove the cycle around your outage schedule.

What files should we send?

Cell layouts or CAD if available, robot models and controller generation, current robot and PLC backups, the sequence, and your outage window. Upload them with the RFQ form (up to 10 MB, zipped) or email sales@ts-controls.com.

Robot work on an auto or EV line? Describe the cell.

Send the layout, backups, and the change you need, and we’ll come back with a plan. Robot down on the line? Call the 24/7 line, subject to personnel availability.

Line down? (877) 790-4697 24/7, subject to personnel availability

What to send

  • STEP 5: the whole project folder, zipped (the program file ends in ST.S5D, plus the other S5D files beside it).
  • STEP 7 V5.x: a SIMATIC Manager archive (.zip), from File > Archive.
  • TIA Portal: a project archive (.zapNN) from Project > Archive, and the TIA Portal version and update level.
  • RSLogix 5 and 500: the program file (.RSP or .RSS), saved from the software or uploaded from the PLC first.
  • Studio 5000: the project (.ACD) or an .L5X export, and the controller firmware revision.
  • Robot backups: a full KUKA archive, a FANUC “All of above” backup or an ABB controller backup.

Which files to include, by platform

Office: (877) 524-6674, Mon–Fri 9:00am–5:00pm ET

Email: sales@ts-controls.com

Mailing address: 6650 Rivers Ave Ste. 105, N. Charleston, SC 29406

Quote request

Used only to call you about this request. We do not text it. See our Privacy Policy. Want job texts? Sign up here (optional).

PDF, Office, ZIP, or drawing, up to 10 MB; zip project files (ACD, RSS, TIA archives) first. It is emailed to sales@ts-controls.com.

Requests sent by 3 PM Eastern get a reply the same business day.