Siemens PLC & TIA Portal programming: Step 5 through TIA Portal.

SIMATIC programs written, migrated, and brought live — on the floor, not from a cubicle two states away.

Controllers
S5 to S7-1500
Software
Step 7, TIA Portal, WinCC
Networks
PROFINET, PROFIBUS

On the floor at

  • BMW Plant 10
  • SpaceX
  • Tesla
  • Mercedes-Benz U.S. International
  • thyssenkrupp TKAE / TKAB
  • Robert Bosch LLC
Customers

TIA Portal · Step 7 · SIMATIC

Siemens PLC, HMI, and drive programming.

All services
  1. Step 5

    Outdated, still running. We support it, and we will talk through a staged move off S5 before spare parts decide for you.

  2. S7-300, S7-400, and SIMATIC Manager

    Changes to an existing S7-300 or S7-400 program in STEP 7 (SIMATIC Manager) or TIA Portal, or a new one written from scratch. Send the base project and the symptom.

  3. TIA Portal — any version

    We carry licensing for current TIA Portal versions. S7-1200, S7-1500, Comfort Panels, and WinCC inside the portal.

  4. Drives, PROFINET, and I/O

    SINAMICS and third-party drives, PROFINET, PROFIBUS, Ethernet, and I/O checkout.

On this platform

  • Step 5
  • Step 7
  • SIMATIC Manager
  • S7-300
  • S7-400
  • TIA Portal
  • S7-1200
  • S7-1500
  • WinCC
  • Comfort Panels
  • SINAMICS
  • PROFINET
  • PROFIBUS
MigrationS5 & S7-300 to TIA PortalStaged around your outage windows. MigrationS7-300 to S7-1500 migrationS7-300 went spares-only Oct 1, 2025.

Straight answers

Siemens programming, answered.

Do you still support Siemens Step 5?

Yes. Step 5 is outdated but still running in plenty of plants, and we support it. We will also talk through a staged move off S5 before spare parts set the schedule for you.

Which TIA Portal versions and controllers do you work with?

We carry licensing for current TIA Portal versions and work on S7-300 and S7-400 controllers in STEP 7 (SIMATIC Manager) or TIA Portal, S7-1200 and S7-1500 controllers, Comfort Panels, and WinCC inside the portal.

Can you migrate a legacy Siemens program to TIA Portal?

Yes. We work from legacy Step 5 through current TIA Portal, including migrations off retired platforms. Send the existing project and we will scope the move around your outage window. How it runs: S7-300 to S7-1500 and S5 (Step 5) to TIA Portal.

Do you set up SINAMICS drives and PROFINET networks?

Yes. SINAMICS and third-party drives, PROFINET, PROFIBUS, and Ethernet networks, and I/O checkout on the floor.

Do you program Siemens HMIs and WinCC?

Yes. Comfort Panels and WinCC inside TIA Portal. During a migration, older OP and TP panels and WinCC flexible projects move to Comfort Panels and WinCC in TIA Portal. Field note: WinCC Unified vs Comfort for a new line. Moving to Ignition instead? See Ignition programming.

What should I send with a Siemens RFQ?

The TIA Portal or Step 7 project, the symptom, and your outage window. Upload it with the form on this page and it goes straight to sales@ts-controls.com. Line down? Call (877) 790-4697, 24/7, subject to personnel availability.

Request a quote

Send the TIA or Step 7 project.

Platform, symptom, and outage window. It lands in the sales inbox, and we come back with a plan, not a brochure.

New customer? Send a competing quote too, and we will tell you if we can come in 15% under it.

Not sure which files to send? What to send, by software version.

Line down? (877) 790-4697, 24/7

24/7, subject to personnel availability. How line-down support works.

Planning work? Office: (877) 524-6674

TS Controls · Anderson, SC · on-site across the Upstate and nationwide.

Request type

Used only to call you about this request. We do not text it. See our Privacy Policy. Want job texts? Sign up here (optional).

PDF, Office, ZIP, or drawing, up to 10 MB; zip project files (ACD, RSS, TIA archives) first. It is emailed to sales@ts-controls.com.

Line down? Call (877) 790-4697, 24/7, subject to personnel availability.

Line down Send an RFQ