Legacy PLC migration: S7-300, PLC-5 and SLC 500

Siemens moved the S7-300 to spares-only on Oct 1, 2025. Rockwell discontinued the remaining PLC-5 processors in 2017 and lists several SLC 500 controllers as discontinued. If your lines still run on them, the question is when you migrate, not whether.

We start with an audit that tells you where you stand: what controllers you have, how exposed each line is if a card fails, and a staged plan to migrate during planned downtime, with a fallback to the old rack if anything goes sideways.

Request a quote
Line down? (877) 790-4697 24/7, subject to personnel availability
Platforms
S7-300, PLC-5, SLC 500
You get
An audit and a staged plan
Fallback
The old rack, ready to go back in

Illustrative model

  1. Back up and documentWhat is running today
  2. Convert and rewriteTested before the window
  3. Cut over on siteOld rack ready to go back in
  4. Prove with operatorsBefore we leave

Platform status

Spares only

Siemens S7-300 and ET 200M have been spare parts only since October 1, 2025.

Source: Siemens, Oct 1, 2025

S7-300 to S7-1500 migration

  1. Active productUntil Oct 1, 2023
  2. Spare parts onlySince Oct 1, 2025
  3. Spare parts plannedUntil Oct 1, 2033

Discontinued

Rockwell discontinued the remaining PLC-5 processors in 2017. RSLogix 5 reached the end of its life cycle at the end of 2025.

Source: Rockwell, 2017; Rockwell, Dec 31, 2025

PLC-5 to ControlLogix migration

  1. End of life announced2017
  2. New RSLogix 5 activations stoppedAfter Dec 31, 2025

Partly discontinued

Rockwell lists several SLC 500 processors as discontinued and points new systems at CompactLogix.

Source: Rockwell

SLC 500 to CompactLogix migration

Find out where you stand

What we migrate

What the audit gives you

  • An inventory of legacy controllers, line by line
  • Spares risk for each: if it died tonight, is there one on the shelf?
  • A staged migration plan sized to your shutdown windows
  • A fallback plan so you can return to the old rack if needed

The plan is yours. If you want us to do the work, we quote it from the hours it actually takes.

How the cutover works

  1. We back up and document what is running today.
  2. We convert and rewrite the program, then test it before the window.
  3. We cut over on site during your outage, with the old hardware ready to go back in.
  4. We prove it with your operators before we leave.

See also: Outage-window planning, Program backup and version control

Migration pages

Outage planning

A written cutover plan for the shutdown window

Outage planning

Modeled best case

A best-case model, not a measured result.

Modeled area: four lines on S7-300, PLC-5 and SLC 500, audited first, then migrated one line per planned outage.

  • Model

    Lines with no spare CPU on the shelf (of 4)

    Before: 3After: 0

    Each migrated line runs on a current CPU, with a spare stocked for it.

  • Model

    Lines with no verified backup (of 4)

    Before: 2After: 0

    Each cutover ends with the backups brought up to date, so every line ends with a backup that matches what is running.

  • Model

    Unplanned controls downtime, per month

    Before: 9 hAfter: 1 h

    Aging racks and cards come out one line at a time, so fewer failures stop a line between outages.

Illustrative figures for the line, cell or area described, when everything goes right. They are not measured, not from any plant we have supported, not typical, and not a promise. A real job starts from your own baseline.

Straight answers.

Do we have to migrate everything at once?

No. You can go line by line, starting with the most exposed one.

Can existing code that nobody here wrote be converted?

Yes. We read what is running, document it, and convert it. Messy legacy code is normal.

What if the new system has a problem on startup?

That is why every plan has a fallback to the old rack until the new one is proven.

Is the audit done on site?

Yes. Evaluations happen at the machine so the first trip is not a guessing trip.

Find out where your controllers stand.

Send the plant, the controllers on each line, and your next shutdown. We come back with an audit plan, not a brochure.

Line down? (877) 790-4697 24/7, subject to personnel availability

What to send

  • STEP 5: the whole project folder, zipped (the program file ends in ST.S5D, plus the other S5D files beside it).
  • STEP 7 V5.x: a SIMATIC Manager archive (.zip), from File > Archive.
  • TIA Portal: a project archive (.zapNN) from Project > Archive, and the TIA Portal version and update level.
  • RSLogix 5 and 500: the program file (.RSP or .RSS), saved from the software or uploaded from the PLC first.
  • Studio 5000: the project (.ACD) or an .L5X export, and the controller firmware revision.
  • Robot backups: a full KUKA archive, a FANUC “All of above” backup or an ABB controller backup.

Which files to include, by platform

Office: (877) 524-6674, Mon–Fri 9:00am–5:00pm ET

Email: sales@ts-controls.com

Mailing address: 6650 Rivers Ave Ste. 105, N. Charleston, SC 29406

Quote request Legacy PLC migration

Used only to call you about this request. We do not text it. See our Privacy Policy. Want job texts? Sign up here (optional).

Requests sent by 3 PM Eastern get a reply the same business day.