Planning work? Office (877) 524-6674, Monday–Friday, 9:00am–5:00pm ETOffice (877) 524-6674

TS Controls home

An OT network security assessment for the plant floor

A plant network can grow one cell at a time, and the ways in for remote support can grow with it.

In an OT network security assessment, we review with your IT team how your plant network is segmented and how remote connections reach it, and hand you written findings and a prioritized list of fixes.

Request a quote
Line down? (877) 790-4697 24/7, subject to personnel availability
Reviews
Segmentation and remote access
Done with
Your IT team
You get
Written findings and a fix list

Illustrative model

  1. SegmentationHow the plant floor is separated
  2. Remote accessThe ways in we find
  3. Boundary devicesFirewalls and the rules on them
  4. What is connectedChecked against the drawings

What we review

  • Segmentation: how the plant floor is separated from the business network, and how lines and cells are separated from each other
  • Remote access: the ways in we find for vendors, integrators, and your own team, including modems or remote tools in cabinets
  • Boundary devices: the firewalls and switches between zones, and the rules on them
  • What is connected: the PLCs, HMIs, robots, and PCs on each network, against the drawings

What you get

  • Written findings, network by network
  • A prioritized fix list: what to fix first, and why
  • Notes on which fixes need an outage window

The findings are yours. Your IT team can make the fixes, or we can quote the controls side of them.

Done with your IT team

We agree with your IT team what we look at, how, and when, and nothing is scanned, connected, or changed without their approval. Any work on a live network is planned around production. The audit is a working review of your network, not an assessment against a standard.

See also: Remote support, SCADA/MES integration

Straight answers.

Will the audit disrupt production?

Most of the review is reading drawings and configurations and walking the cabinets. Any work on a live network is planned with your team, around production.

Is this a compliance audit?

No. It is a working review of your plant network and remote access, with written findings and a prioritized fix list. It is not an assessment against a standard.

Can the fixes be made by TS Controls?

On the controls side, yes, quoted separately: PLC, HMI, and robot network changes, planned for an outage window where needed. Your IT team keeps the business side.

Is remote access needed for the audit?

No. The audit is done on-site with your IT team. If you want remote support afterward, it is set up separately, on the method your IT team approves.

What should we send?

The plant, the lines, your network drawings if you have them, the remote access tools vendors use today, and who on your IT team we should work with.

Review your plant network with us.

Tell us the plant, the lines, who on your IT team we should work with, and whether you have network drawings.

Line down? (877) 790-4697 24/7, subject to personnel availability

What to send

  • STEP 5: the whole project folder, zipped (the program file ends in ST.S5D, plus the other S5D files beside it).
  • STEP 7 V5.x: a SIMATIC Manager archive (.zip), from File > Archive.
  • TIA Portal: a project archive (.zapNN) from Project > Archive, and the TIA Portal version and update level.
  • RSLogix 5 and 500: the program file (.RSP or .RSS), saved from the software or uploaded from the PLC first.
  • Studio 5000: the project (.ACD) or an .L5X export, and the controller firmware revision.
  • Robot backups: a full KUKA archive, a FANUC “All of above” backup or an ABB controller backup.

Which files to include, by platform

Office: (877) 524-6674, Mon–Fri 9:00am–5:00pm ET

Email: sales@ts-controls.com

Mailing address: 6650 Rivers Ave Ste. 105, N. Charleston, SC 29406

Quote request Network security audit

Used only to call you about this request. We do not text it. See our Privacy Policy. Want job texts? Sign up here (optional).

Requests sent by 3 PM Eastern get a reply the same business day.