Planning work? Office (877) 524-6674, Monday–Friday, 9:00am–5:00pm ETOffice (877) 524-6674

TS Controls home

Industry 5.0 pilot: prove it on one cell first

Our Industry 5.0 work uses adaptive, machine-based learning to keep robot paths, offsets and weave inside the window, so you don't spend weekends on the teach pendant. KUKA with Siemens TIA Portal was the prototype. We are expanding to Allen-Bradley, FANUC and ABB.

We'd rather show you than tell you. A pilot takes one cell and measures it honestly, before and after.

Request a quote
Line down? (877) 790-4697 24/7, subject to personnel availability
Scope
One cell
Measured
Before and after
Operator
In command

Illustrative model

  1. Pick the cellRecurring weld or robot touchups
  2. Measure the baselineBefore we change anything
  3. Make the improvementOn your floor, with your operators
  4. Measure againBefore and after, whatever it shows

How a pilot works

  1. Pick the cell. Usually one with recurring weld or robot touchups.
  2. Measure the baseline. We agree on what to measure before we change anything.
  3. Make the improvement. On your floor, with your operators.
  4. Measure again. You see the before and after, whatever it shows.

Hands-free. Human in command.

The cell learns from its own cycle. Your people supervise; they don't babysit every joint.

Documenting the result

With your written permission, we would like to film the pilot. Nothing is published, and your plant is not named, without your written OK.

See also: Industry 5.0, Robot programming, Outage-window planning

Modeled best case

A best-case model, not a measured result.

Modeled cell: a two-robot KUKA arc-weld cell on an S7-1500 in Siemens TIA Portal, running two shifts, with recurring weld touchups.

  • Model

    Weld touchups per shift

    Before: 12After: 0

    Adaptive correction keeps paths, offsets and weave inside the window, so no weld needs a manual fix.

  • Model

    Teach-pendant hours on weekends, per month

    Before: 16 hAfter: 0 h

    The cell corrects its own drift during the cycle, so nobody spends a weekend reteaching it.

  • Model

    Cell stops for weld faults, per week

    Before: 6After: 1

    Paths held inside the window stop faulting the robot, so the stops left come from other causes.

Illustrative figures for the line, cell or area described, when everything goes right. They are not measured, not from any plant we have supported, not typical, and not a promise. A real job starts from your own baseline.

Straight answers.

Which robots does this work on today?

The prototype is live on KUKA with Siemens TIA Portal. Allen-Bradley, FANUC and ABB are in expansion. Ask about your cell.

Do we have to agree to filming?

No. Filming is optional and needs your written consent.

How is the pilot quoted?

Sized to the job, from the hours it actually takes.

Bring us one cell.

Tell us the cell, the robots and the PLC, and what you want measured before and after.

Line down? (877) 790-4697 24/7, subject to personnel availability

What to send

  • STEP 5: the whole project folder, zipped (the program file ends in ST.S5D, plus the other S5D files beside it).
  • STEP 7 V5.x: a SIMATIC Manager archive (.zip), from File > Archive.
  • TIA Portal: a project archive (.zapNN) from Project > Archive, and the TIA Portal version and update level.
  • RSLogix 5 and 500: the program file (.RSP or .RSS), saved from the software or uploaded from the PLC first.
  • Studio 5000: the project (.ACD) or an .L5X export, and the controller firmware revision.
  • Robot backups: a full KUKA archive, a FANUC “All of above” backup or an ABB controller backup.

Which files to include, by platform

Office: (877) 524-6674, Mon–Fri 9:00am–5:00pm ET

Email: sales@ts-controls.com

Mailing address: 6650 Rivers Ave Ste. 105, N. Charleston, SC 29406

Quote request Industry 5.0 pilot

Used only to call you about this request. We do not text it. See our Privacy Policy. Want job texts? Sign up here (optional).

Requests sent by 3 PM Eastern get a reply the same business day.